A new single-parcel pier on Lake Tahoe

A new pier on one Lake Tahoe parcel still needs an allocation from the Tahoe Regional Planning Agency (TRPA). The next private window is June 2027. An allocation is not a permit, and it is not available on demand.

Our team stays with the project through TRPA and the other agencies with a say on the water: state lands, the Corps, water quality, and fish and wildlife.

Start with whether a new pier is even eligible

A single-parcel pier is a longer shot.

In 2025, 2 of 52 single-parcel applications were selected. That is a longer shot than a shared pier (11 of 22 that year). Sharing is often more realistic. It is still not a guarantee. See new shared / multi-parcel pier.

We can review eligibility if you want a clear answer, and prepare an application if you choose to wait for 2027.

How we can help you

  • Tell you whether your lot can have its own pier, before you spend on a design that cannot file.
  • Give you a straight read on whether a single-parcel slot is realistic, so you can decide whether to wait for 2027 or go in with a neighbor.
  • Prepare the 2027 application when that is the path, so the application is ready on time.
  • If a shared pier is stronger, we run that path instead of burning a cycle on a single-parcel try.