Lake Tahoe shorezone
Lake Tahoe pier and shorezone permitting.
Already have a pier? Expansions, repairs, boat lifts, and transfer projects can start now. A new private pier is a longer path: the Tahoe Regional Planning Agency’s (TRPA) next allocation window is June 2027.
How a project gets approval
Our team, from permit through construction.
We have helped hundreds of lakefront owners with their projects including Tahoe piers. The same team stays on your project from the TRPA application through design and construction, weaving through a maze of agencies and regulations.
Fish habitat
We time in-water work for the October through April window, so a missed season does not sit the pier a year.
Other agencies, same time
We file state lands, the Corps of Engineers, water quality, and fish and wildlife on the same clock as TRPA, so they are not waiting until TRPA is done.
Two seasons
We plan summer grading and winter in-water work together, so a pier plus shore work is not stranded across years.
Underwater drone
Surveys and photography, done in-house.
When TRPA requires a biological survey, a scenic assessment, or drone photos from the lake and underwater, that work stays on our team, so you do not hire a second crew. Tahoe yellow cress often needs a summer survey before anyone touches the shore. Scenic review is how the project area conforms with scenic regulations, and what is viewable from the lake, not an afterthought.

Different agencies require different permits.
A Tahoe project is not just a TRPA permit. It often includes the Tahoe Regional Planning Agency (TRPA), plus state, county, and city agencies. That process is complex. We work with them all.
TRPA is the bi-state shorezone permit. State lands is a second permit, and the two states do not run it the same way.
On the California shore, structures on the lakebed typically need a California State Lands Commission lease. On the Nevada shore, the Nevada Division of State Lands (NDSL) issues its own permit. NDSL permits typically die when the property sells or the owning entity changes. TRPA permits transfer with the property.
Sister agencies run at the same time, not after TRPA is done: state lands, the Corps of Engineers, water quality, and fish and wildlife. We start those on the same clock as the TRPA permit.
If a deadline is missed, or a step is filed the wrong way, a shorezone project can lose years. That is where experience in the Tahoe Basin matters. This process is hard to run yourself, and riskier with a consultant who does not know how it works here.
Contact
Tell us about your project.
Existing pier, a lift, buoys, or a new pier. A few details are enough to start.
(530) 583-6882 · jan@janbrisco.com
PO Box 1888 · 620 N Lake Blvd, Tahoe City, CA 96145
